Our construction management allows us to be nimble throughout the building cycle achieving completion timeline and budget requirements.  We are involved in several projects at the same time, here are a few that are in various stages including completed.

Current Projects

Evergreen Centre – New Construction – Artist Rendition.

We will be building the newest construction project at Evergreen Centre in Sooke BC. New 6000 sqft commercial building now under construction, building consists of structural steel frame work with steel stud walls. Here are some artists renditions of what it will look like when completed.

Current Projects

Land development and Residential Duplex’s

Grant road development consisting of 2 new duplex units on the road frontage and farm land reclamation consisting of complete clearing of over growth and reinstatement of farmable land for future organic farming.

Kemp Lake Water Line Extension and New Pump Station

Installation of approximately 2 kilometers of 250mm water line including new fire hydrants and isolation valves. Construction of a new pump house and chlorination station fully automated and automated control systems.

Recent Projects

Industrial Building Sooke Business Park

14000 square foot pre-engineered building, structural steel frame with metal cladding finishes, structure set on 14 foot deep concrete pilings and foundations formed on top of pilings

Shirley Fire Department – photos pending

Construction of a new apparatus bay and connect to the existing fire hall, wood frame construction finished with fire resistant cement siding and metal clad roofing. Removal of existing wood finishes on existing fire hall and replace with fire resistant cement siding

Throup Road Stairs

Contracted by the District of Sooke there was a need for new stairs to provide safe exiting from the cross walk down to the parking area. Constructed of pressure treated timbers with gravel infill and center handrail

Sooke Brewing Co.

Single storey, wood framed, Features:  Natural tree feature at entrance, exterior metal cladding with stone accent band on base, hand cut fir rafters with tongue and groove infills at front entrance soffit. Building consists of Brew room, tasting room and adjoining retail space. Storm water management system and brewery waste water treatment systems were placed in the parking lot under the asphalt.

Highlands Community Hall 

Single story, wood framed, wood sprung floor in main hall area with adjoining foyer and washroom facilities, green roofs at entrances, rain gardens, solar assisted hot water, UV and carbon filtered potable water system, electric car charging stations

Sooke Community Hall

Structural replacement of front entrance stairs and railings, stairs and supporting structure were completely rebuilt and new natural fir wood features installed with new hand rails, non-slip surfacing installed on stair treads and fiber cement siding installed in place of existing vinyl siding on face.

Sooke Laundromat  

Wood frame, one and a half story, featuring exterior decorative wood beams, State of the art laundry facility with gas fired high efficiency demand boilers, high efficiency gas dryers , coffee bar and sandwich café’

Sooke Carwash + Detailing   

Value 1.1 million Concrete masonry block, automatic drive through carwash bay , 2 wand wash bays and detailing center, gas fired demand hot water, 70% recycled water capturing system

Previous Large Scale Projects

North Saanich Middle School 

Construction  was a mix of tilt up concrete panels with structural steel superstructure and laminated wood beam roof structure ,  hybrid wall systems using exterior spray foam  insulation , features included geothermal system , in floor closed loop heating/cooling  ,solar hot water, photovoltaic system , wind energy generation , recycled water toilets, daylight harvesting  and fully automated building controls systems. LEED Gold  – Project value 19 million, completed Jan 2013

Airside Operations Centre / Victoria Airport Authority

Construction was primarily structural steel and concrete masonry, the apparatus bays and operations center are designed to resist a seismic event and act as post disaster Airport fire department and operations center. Some features of this project were use of a geothermal system with in floor closed loop heating / cooling in the maintenance and apparatus bays, living quarters for fire department personnel complete with sleeping area and full cooking facilities, automated interior alarms and apparatus bay doors linked to air control tower. LEED principals used. Project value 8.5 million, completed March 2010

St Andrews Walk East and West   

Bear Mountain Langford B.C., construction of 127 units, buildings consisting of underground parking with 4 story wood frame condominiums above. Wood frame was used up to 4 floors and featured some fairly intense seismic systems, including a layered truss system to achieve the 12/12 roof pitch for the desired look. Stone veneers and extensive landscaping and exceptional interior finishes.   Project value 28 million completed in 2009

Legion Manor 

Legion housing society, Saanichton B.C., 3 story wood frame over half basement, assisted living facility complete with nurse call system and commercial kitchen. Challenge on this build was slot cutting and systematically casting foundation walls, shoring and then connecting to an existing building which would become the commercial kitchen and dining room. Project value 6.8 million Completed 2008- 2009

Heritage Green   

Town houses and condominiums at Polo Park, underground parking with wood frame 3 story condominium and 15 town townhouses. Features of this project were extensive landscape, paver drive isle and planted areas over underground parking. Project value 7.4 million Completed 2007 -2008